Quick summary
The short version: To migrate from Smartsheet to Celoxis, export each project sheet to Excel, or export Gantt sheets as Microsoft Project XML. Request a backup to keep comments and attachments. Then clean the files and import them into Celoxis. Task data moves across; formulas, automations, dashboards and reports are rebuilt in Celoxis.
- Three ways out of Smartsheet: Excel (any sheet, any plan), Microsoft Project XML (Gantt sheets only), and a backup .zip (Business and Enterprise plans).
- What doesn’t export: formulas, groupings and summary rows. Attachments only come out in a backup.
- Time: Migration timelines vary based on the number of projects, data complexity, attachments, and workflows that need rebuilding.
Introduction
Smartsheet works well when a project fits in one sheet. Problems start when a team runs dozens of them: the portfolio view is a stack of reports, resource planning lives somewhere else, and formulas and automations become the system nobody else understands.
This guide shows how to migrate from Smartsheet to Celoxis step by step. It covers which export to use for each kind of data, what each export leaves behind, how to clean the files, and how to import and check them. It also covers what has to be rebuilt rather than moved, so you can plan for it before you start.
The steps come from what the Celoxis team sees when Smartsheet customers make the move. Celoxis has experience supporting customers through migration planning and guided onboarding, including helping teams evaluate how their existing project data and workflows can move into Celoxis.
Who this guide is for
This guide is for PMO leads, project managers and admins who run projects in Smartsheet and have decided to move them into Celoxis. It works on any Smartsheet plan. Note that the full backup in Step 1, the only export that includes attachments, needs a Business or Enterprise plan.
Still deciding? Start with our Smartsheet alternative page, then come back here when you’re ready to move.
Why teams move off Smartsheet
Smartsheet isn’t retiring, so nobody has to leave. Teams move because their work has outgrown the sheet model.
Sheets don’t add up to a portfolio
Each project lives in its own sheet. Seeing all of them together means building reports and roll-ups, then keeping them in sync as sheets change. As the number of sheets grows, so does the hidden cost of fragmented project tools.
Resource planning sits outside the sheet
Knowing who is overloaded across projects is hard when assignments are spread across many sheets.
Resource Management by Smartsheet: An separately licensed resource planning product that connects to Smartsheet project sheets through an integration. It supports resource assignments, availability, workload planning, and time tracking. Connected sheets synchronize mapped project information, including dates, assignments, and allocation percentages. Resource Management data may need a separate export and migration process when moving to Celoxis.
Formulas and automations become the system
Over time, status logic, roll-ups and alerts move into cross-sheet formulas and automations. They work, but often only one or two people understand them, and a renamed column can break them.
A sheet isn’t a project plan
Smartsheet is flexible work management software, built around rows and columns. PMOs that need schedules, capacity, costs and portfolio views in one model tend to reach its limits as they grow.
Smartsheet licensing changes: Smartsheet introduced a new user-based licensing model with paid Members and temporary Provisional Members. Organizations should review their seat usage and administrator settings to understand potential licensing costs before renewal.
Before you start: decisions to make
Six decisions, made before anyone exports a file, keep a Smartsheet migration from turning into a copy of every sheet you’ve ever made.
- Which sheets move. Project plans move. Old trackers, intake lists and reference sheets may only need archiving.
- Which export to use for each sheet. Gantt sheets can go out as Microsoft Project XML; everything else goes through Excel (see Step 1).
- What happens to each formula. Each one becomes a Celoxis field, a roll-up or a report, or is dropped. List the formulas people actually rely on.
- Which automations, dashboards and reports get rebuilt, and who owns each one. A shared list here makes Step 6 quick. Your PMO software owner is usually the right person to keep it.
- How much history to keep. Comments and attachments only leave Smartsheet in a backup. Decide whether they need to be in Celoxis or only in an archive.
- Your cutover date. Set it before your Smartsheet renewal, so you aren’t paying for two tools while the team switches.
Decisions 3 and 4 take the most time. A migrated sheet is quick; the logic people built around it is the real work.
Step 1: Export your data from Smartsheet
Smartsheet offers three ways to get your data out, and each keeps different things. Most migrations use two of them: Excel or Microsoft Project XML for the plans, plus a backup for comments and attachments.
Choose your export
| Export | Best for | Keeps | Leaves behind | Plans |
|---|---|---|---|---|
| Excel (.xlsx) | Any sheet or report | Cell values; comments on a separate tab | Formulas, groupings, summary rows, attachments. Dropdown, contact, checkbox and symbol columns become plain text | All plans |
| Microsoft Project XML | Gantt sheets | Task structure [TEST RESULT: dependencies, assignments] | Smartsheet warns the file may display differently in other tools | All plans |
| Backup (.zip) | Comments and attachments archive | Sheet data, comments, uploaded attachments | Attachments linked from online storage such as Google Drive, OneDrive or Box | Business, Enterprise |
According to Smartsheet’s help center, exporting needs Owner, Admin or Editor access to the sheet.
How to export Smartsheet to Excel
Open the sheet and select File > Export and choose Microsoft Excel, or right-click the sheet in the workspace panel and export from there. Smartsheet downloads an .xlsx file with the sheet’s values. Comments appear on a separate tab.
Export the source sheet, not a report built on it. Reports only show the rows and columns the report includes, and report exports are limited to 20,000 rows.

Do formulas export from Smartsheet to Excel?
No. Smartsheet exports the result of each formula as a plain value, not the formula itself. Before you export, list the formulas your team relies on (decision 3), because you’ll rebuild their purpose in Celoxis rather than copy them.
Can you export Smartsheet to CSV?
Not directly; CSV isn’t one of Smartsheet’s export formats. Export to Excel, then save the file as CSV in Excel or Google Sheets. That CSV is what you’ll import into Celoxis on the CSV route.
Export Gantt sheets as Microsoft Project XML
For sheets with a Gantt view, Smartsheet can also export a Microsoft Project XML file (Gantt sheets only, not reports). This matters because Celoxis imports Microsoft Project XML directly, which may carry more of your plan’s structure than a spreadsheet.
Request a backup for comments and attachments
On eligible Smartsheet Business and Enterprise plans, you can request a one-time or recurring weekly backup. Right-click the relevant sheet, folder, or workspace, select the backup option, and check Include attachments.
Smartsheet provides a downloadable ZIP file containing sheet data, comments, and uploaded attachments.
Two important limitations:
- 4 GB maximum: Individual backup files cannot exceed 4 GB.
- Externally linked files: Files stored in Google Drive, OneDrive, Box, Dropbox, or similar services are not included. Preserve those links and ensure the files remain accessible.
Migration note: Keep the backup as a reference for comments and attachments. These may require separate handling when migrating to Celoxis and should not be assumed to transfer automatically.

Step 2: Clean the export file before you import it
If you’re using the Microsoft Project XML route, skip to Step 3. For the Excel route, four fixes in a spreadsheet turn a Smartsheet export into a file Celoxis can rebuild your plan from.
Remove summary rows and formula-only columns
Delete total rows, blank separator rows and any column that only held a formula result you’ll recreate in Celoxis (for example a % complete roll-up or a RAG status). Keep the raw inputs those formulas used.
Turn indentation into WBS codes
Smartsheet shows hierarchy by indenting child rows under parent rows. Celoxis builds the task hierarchy from WBS codes, so add a WBS column that numbers each level:
| Smartsheet row (indent level) | WBS code |
|---|---|
| Discovery (parent) | 1 |
| Stakeholder interviews | 1.1 |
| Requirements sign-off | 1.2 |
| Build (parent) | 2 |
| Configure workspace | 2.1 |
Rewrite predecessors as WBS codes
Smartsheet predecessors reference row numbers. For example, 3FS +2d means the task starts two days after row 3 finishes.
Celoxis CSV import uses WBS codes instead of row numbers. Before importing, map each Smartsheet row to its corresponding WBS code and replace the row references. For multiple predecessors, separate the WBS codes with semicolons, such as 1.1;1.2.
Dependency types and lag: Celoxis’s CSV import documentation confirms predecessor links using WBS codes but does not specify support for dependency types (FS, SS, FF, SF) or lag values such as +2d. Do not assume these details will transfer. Test them during migration and recreate any unsupported relationships in Celoxis.
Convert column types
- Dropdown columns become values for Celoxis custom fields. Note every option used.
- Contact columns become resource names. Make sure they match Celoxis user names.
- Checkbox columns export as True or False. Map them to a status or a completion value.
- Symbol columns (RAG balls, flags) export as text. Decide whether they become a custom field or are recalculated in Celoxis.

Step 3: Prepare Celoxis for the import
Set up four things in Celoxis first, so imported tasks have somewhere to land.
- Users. Everyone named in a Smartsheet contact column needs a Celoxis user. Matching names make assignment mapping simple.
- Calendars and holidays. Dates are calculated against the Celoxis calendar, so set working days and holidays for each team.
- Custom fields. Celoxis imports custom field values only into fields that already exist. Create one for each dropdown or text column you’re keeping. For multi-select fields, separate values with a pipe, for example
Design | Build. - Statuses. Decide how your Smartsheet status values map to Celoxis.
Step 4: Import your plans into Celoxis
Use the route that matches the export you chose in Step 1.
Option A: Import the Microsoft Project XML file
Celoxis imports Microsoft Project files with their task hierarchy, dependencies, constraints and resource assignments. Create a new project from the file, or add its tasks to an existing project, then map resources to Celoxis users. The steps are the same as for a file saved from Microsoft Project, and are covered in full in our guide to migrate from Microsoft Project to Celoxis.
Option B: Import the CSV file
- Open the project and select Project Actions ▸ More ▸ Import Tasks (CSV), or from the Gantt chart select Add ▸ Import CSV.
- Upload your cleaned CSV.
- Map each column to a Celoxis field. Summary (the task name), Start and Finish are required.
- Map the WBS column to rebuild the hierarchy and the predecessors column to rebuild the links.
- Map owners to resources. Effort can be assigned in hours or as a percentage, for example
Alice[2h]orAlice[25%]. - Finish the import and open the Gantt chart.
The Celoxis knowledge base lists every field you can map when importing tasks from CSV.

How Smartsheet maps to Celoxis
Plan data has a direct home in Celoxis. The logic built around it (formulas, automations, dashboards and forms) is rebuilt rather than moved.
| Smartsheet | In Celoxis | Migration status |
|---|---|---|
| Sheet (project plan) | Project and tasks | Needs setup — create or select a project and import tasks |
| Parent and child rows | Summary tasks and WBS hierarchy | Needs setup — CSV hierarchy must be mapped; XML route requires testing |
| Predecessors (row numbers) | Predecessors using WBS codes | Needs conversion — verify dependency types and lag |
| Start, finish, duration | Project task dates and durations | Needs validation — confirm imported dates and scheduling behavior |
| Assigned To (contact column) | Resource assignments | Needs setup — users and assignment mapping must be verified |
| Dropdown, text and number columns | Custom fields | Needs setup — create compatible fields and map values |
| Formulas and cross-sheet references | Calculated fields, roll-ups or reports where applicable | Rebuilt — no automatic formula conversion confirmed |
| Automations | Celoxis workflows or other supported automation mechanisms | Rebuilt — verify each automation’s equivalent |
| Dashboards and reports | Celoxis dashboards and reports | Rebuilt |
| Forms | Celoxis intake or request workflow, subject to feature verification | Rebuilt |
| Comments and attachments | Archived comments and files; Celoxis project/task records where supported | Separate handling — automatic transfer not confirmed |
Automations become workflows
Smartsheet automations (alerts, approval requests, row moves) don’t export with any of the three routes. List them before you leave, note what triggers each one, and rebuild the ones still needed. Our guide to workflow management software explains what a good workflow setup looks like. Celoxis supports flexible workflows for managing business processes such as intake, approvals, risks, issues, and changes. However, Smartsheet automations do not automatically transfer to Celoxis. Each automation needs to be reviewed and, where supported, recreated using the appropriate Celoxis workflow capabilities.
Dashboards and reports become views
Dashboards and reports don’t export as working objects. Rebuild them in Celoxis from the imported data, starting with the views your leadership checks every week. The Celoxis knowledge base explains how project views work.
Worked example: migrating a Smartsheet project to Celoxis
When migrating a Smartsheet project to Celoxis, you can use an Excel export or, where available, a Microsoft Project XML export. Each route may preserve different parts of the project.
The important question is not just whether the data appears in the exported file, but whether Celoxis imports and interprets it correctly.
Here are three areas to validate during a test migration.
1. Hierarchy and dependencies: which export preserves them?
What to check in each export: Inspect whether the Excel file preserves parent-child indentation and predecessor references. For the XML export, check whether task hierarchy, dependency types, and lag values are present.
What to check in Celoxis: Celoxis supports importing task hierarchy and dependencies through Microsoft Project files. Its CSV importer uses WBS codes to represent hierarchy and predecessor links, so Smartsheet row references must be converted before import. CSV support for dependency types and lag remains unverified.
Verdict: The XML route may reduce manual setup, but preservation of the actual Smartsheet hierarchy and dependencies must be confirmed through testing. The CSV route requires field mapping and predecessor conversion.
How to check yours: Compare the task hierarchy, dependency relationships, critical path, and project finish date before and after migration.
2. Formulas and column types: what becomes data, and what needs rebuilding?
What to check in the export: Review formula results, dropdown values, contact fields, and other custom columns to determine how they appear in the exported file.
What to check in Celoxis: Map compatible column values to Celoxis fields. Create the required custom fields before importing. Review formulas and cross-sheet references separately, as their logic should not be assumed to transfer.
Verdict: Column values generally require mapping and setup. Formula-driven calculations and cross-sheet logic need to be assessed and rebuilt using suitable Celoxis capabilities where available.
How to check yours: Compare the imported values with their Smartsheet equivalents. For rebuilt calculations, validate at least 10 representative rows, including edge cases.
3. Attachments, comments, and automations: what comes across?
What to check in the backup: Review which comments and uploaded attachments are included. Check externally linked files separately rather than assuming they are contained in the archive.
What to check in Celoxis: Celoxis supports attaching files to projects and tasks, but automatic transfer of Smartsheet attachments and historical comments has not been confirmed. Determine which files should be attached to Celoxis records and which historical information should remain archived.
Celoxis also supports flexible workflows for processes such as intake, approvals, risks, issues, and changes. However, Smartsheet automations do not automatically transfer. Each automation must be reviewed and recreated using appropriate Celoxis capabilities where supported.
Verdict: Attachments and comments require separate migration or archiving arrangements. Automations require rebuilding.
How to check yours: Confirm that important files remain accessible, historical comments are retained where needed, and each recreated workflow behaves as expected. Test workflows with the people who originally owned them in Smartsheet.
Results at a glance
| Can transfer with validation | Needs setup in Celoxis | Needs rebuilding in Celoxis |
|---|---|---|
| Task names, start and finish dates, durations, and resource assignments, subject to successful import and field mapping | Hierarchy and predecessors (CSV route), custom fields, users, calendars, comments, and attachments | Formulas, automations, dashboards, reports, and forms |
Important: Task names, dates, durations, and assignments have not been confirmed through an actual test import. Avoid labeling them “Moved as-is” until the results are available.

The fastest way to know how your own sheets will behave is to import one real project and compare it side by side. That’s what we recommend before you commit.
Step 5: Validate the imported plan
Check each imported project against its Smartsheet source before the team starts using it.
- Row count matches the source sheet (minus summary rows you removed).
- Hierarchy: parent rows became summary tasks at the right level.
- Dependencies link the right tasks, with the right lag.
- Owners are assigned to the right tasks.
- Custom field values match for a sample of 10 rows.
- Dates make sense in the Gantt chart.
The Gantt view is the fastest place to spot a broken link or a task in the wrong phase. If your team is new to reading one, our guide to the Gantt chart for project management is a good primer.
Step 6: Rebuild what doesn’t migrate
Use the list from decision 4 and rebuild in order of use, not in order of creation.
- The views leadership checks weekly: portfolio status, overdue work, upcoming milestones.
- The automations people would notice missing: approval requests and due-date alerts.
- Intake: how new project requests arrive, if a Smartsheet form handled it today.
- Everything else, only if someone asks for it within the first month.
Many teams find that a large share of old sheets, reports and automations are never asked for again.
Step 7: Run in parallel, then cut over
There’s no vendor deadline, so set your own and stick to it.
- Run both tools for on live projects and compare.
- Set a freeze date. After it, nobody edits plans in Smartsheet.
- Do a final export and import of anything that changed during the parallel run.
- Request a final backup with attachments and store it where your team controls it.
- Switch the team over before your Smartsheet renewal date.
What changes for your team after the move
The work your team did around Smartsheet (roll-up reports, capacity checks, cost formulas) happens in one model in Celoxis.
One portfolio instead of many sheets
Migrated projects sit in a single portfolio, so status, risk and progress roll up without report sheets to maintain. See what enterprise PPM software adds at portfolio level.
Capacity across every project
Assignments from all projects feed one workload view, so you can see who is overloaded before deadlines slip. Learn more about resource capacity planning software and resource planning software.
Budgets and costs without formulas
Cost and budget tracking sits next to the schedule instead of in a formula column. See how project budgeting software handles this.
Collaboration in context
Comments, files and updates stay on the task they belong to, so discussion doesn’t drift into email. Read more about collaborative project management software.
Cloud or on-premise
Celoxis runs in the cloud or on your own servers. Teams with strict data rules can choose on premise project management software.
Common mistakes we see
These come up again and again when teams migrate from Smartsheet.
- Expecting formulas to export. Only their values do.
- Exporting a report instead of the source sheet. You get only the report’s rows and columns.
- Leaving predecessors as row numbers. The links break on import.
- Forgetting comments and attachments. They only come out in a backup, which needs a Business or Enterprise plan.
- Not listing automations before switching off Smartsheet. Alerts and approvals stop silently.
- Rebuilding every old report. Start with what people check weekly.
- Assuming the schedule will match without testing a real project.
- Missing the renewal date and paying for both tools.
If you moved into Smartsheet from spreadsheets in the first place, our Smartsheet vs Excel vs Celoxis comparison explains how each handles project planning.
Conclusion
To migrate from Smartsheet to Celoxis, export your plans to Excel or Microsoft Project XML, request a backup for comments and attachments, clean the files, and import them with WBS codes and predecessors in place. Then rebuild the formulas, automations and views your team actually uses. Test one real project first; that’s where any differences show up.
Bring one of your live Smartsheet projects and we’ll rebuild it with you, so you can see how your real plan works in Celoxis.
Prefer to try it yourself? Start a free trial and import one sheet, or see Celoxis pricing.
More migration guides: Migrate from LiquidPlanner to Celoxis